More London Plot 7

Project brief:

Supply facade access and maintenance system with a 35m reach to enable full access to the building envelope.

System solution:

1 x 35m reach telescopic building maintence unit with ‘z-luffing’ jib elevation system.

1 x 4m fixed reach luffing, building maintenance unit on a freely laid twin track system.

2 x powered telescopic gantry systems serving the Soffit and verticle facades directly below the link bridge